Austin-area interior remodelingCall (512) 850-4075
Skip to content

Austin-area remodeling

Whole-Home & Interior
Remodeling in Austin, TX

Bring an outdated interior together with a coordinated renovation. Kirill reviews the whole scope, organizes the team and remains your direct point of contact through the final walkthrough.

Completed Austin apartment renovation with smooth ceiling and refreshed interior
Real work: the complete Austin apartment renovation.

Start with the home you have

A connected interior renovation.

A home remodel often crosses room boundaries: a bathroom affects the flooring, a new door needs trim and paint, and ceiling work needs to happen before the final finish. We plan those connections before the work starts.

Before moving in

Combine surface repairs, painting, floors, interior doors and selected kitchen or bathroom work while the home is accessible. Start with your closing date and the rooms you need ready first.

Several rooms at once

Coordinate the living spaces, bedrooms and hallway finishes so the floor transitions, door details and painted surfaces feel consistent across the agreed scope.

An apartment or condo

Bring multiple improvements into one unit-wide plan. Building access, working hours, debris routes and association requirements need to be reviewed alongside the construction scope.

Define the work

What your remodeling plan can include.

Part of the interiorWork we review with you
Walls & ceilingsDrywall repairs, popcorn texture removal where appropriate, skim coating, specified smooth finishes, primer and painting.
Floors & transitionsLVP or selected engineered flooring, subfloor preparation, thresholds, baseboards and door-clearance adjustments as scoped.
BathroomsDemolition, preparation, waterproofing, tile, tub or shower finishes, vanity and fixtures within the written scope.
Kitchen installationCabinet assembly and installation, IKEA kitchen work, surrounding repairs and finish coordination. Product, countertop and specialist responsibilities are defined separately.
Doors, trim & storageInterior doors, casings, baseboards, closet components and finish details selected for the project.
Selected windowsReplacement and surrounding interior repairs where the opening, product, access and approvals have been reviewed.

Choose the depth of the renovation

A finish update or a deeper change?

First-floor or multi-room refresh

Bring floors, walls, ceilings, doors and selected room updates into one plan. Discuss which surfaces stay, which are replaced and how the rooms connect.

An older home with bigger questions

Updating finishes differs from changing structure or major building systems. Flag known leaks, past repairs and planned layout changes early so any assessments, specialist design or licensed work can be identified.

Planning work between closing and move-in? →

Real scopes, real results

Two renovations. Different starting points.

These Austin projects show how several trades and finish stages can work together. The budgets describe the documented jobs; neither is a package price for another home.

Completed apartment interior in Austin with smooth ceilings and painted walls

Completed work · Austin, TX

Complete apartment renovation

Popcorn texture removal, smooth walls, a full bathroom, doors, three new windows and closet storage.

$19,500 · completed labor scope

Materials separate. See the case for scope and additional-work notes.

Explore the full project →
Completed condo interior by Kir Remodeling in Austin

Completed work · Austin, TX

Complete condo remodel

IKEA kitchen assembly and installation, bathroom, LVP flooring, drywall, paint, doors, trim and fireplace finishes.

$16,500 · original labor agreement

Materials separate. See the case for scope and additional-work notes.

Explore the full project →

Plan the investment

A useful budget starts with the scope.

Separate labor, materials and any independently quoted specialist work. Then review what could change: concealed damage, floor preparation, product choices, access restrictions or added rooms.

Labor

Your written proposal identifies the included work and stages. Published project examples are labor figures unless explicitly stated otherwise.

Materials

Homeowners purchase materials separately, directly or at exact receipt cost without a Kir Remodeling material markup. Selection, ordering and delivery responsibilities are agreed in advance.

Changes

Additional work and discoveries are discussed before proceeding. Review the price, schedule effect and any material decisions together.

Understand remodeling costs →

How it comes together

One sequence across the rooms.

  1. 01

    Review the priorities

    Share the rooms, location, photos, timing and approximate budget. A walkthrough helps establish the actual conditions.

  2. 02

    Define the proposal

    Confirm inclusions, exclusions, material responsibilities, specialist needs and the sequence before choosing a start date.

  3. 03

    Coordinate the work

    Protection and removal come before repairs and installations; final paint and detail work follow the stages that could damage them.

  4. 04

    Review the finish

    Walk the agreed scope, record remaining items and confirm how they will be completed. Stage payments follow the agreement.

See our process and sample documents →

Before you begin

Questions worth asking.

Can we stay at home during the remodel?

Sometimes, but access, dust, bathroom availability and the number of rooms involved determine whether that is practical. We discuss room closures and daily access before scheduling. A vacant interior generally offers different sequencing options from an occupied home.

Do you manage plumbing, electrical and HVAC work?

Kirill coordinates the agreed project. Appropriate licensed specialists can be involved when required. Their scope, cost, permits and responsibility are identified before the affected work begins; they are not assumed to be included in every labor figure.

How long does a whole-home renovation take?

The schedule depends on the actual rooms, preparation, materials, specialist availability and access. The condo case had an original 12-working-day plan for its defined scope, with later extras outside that plan. That is not a promise for another renovation.

Can you phase a larger project?

Yes, we can review essential work first and a later phase where practical. Discuss the entire wish list early so the first phase does not create avoidable rework.

Plan the complete project

Priorities first. A workable phase plan.

Phase 1 · Essential rooms

Identify the bathroom, access routes and surfaces that must be ready first. Review the complete wish list before separating the work.

Phase 2 · Connected improvements

Plan the rooms and finish details that can follow without undoing completed work. Keep product selections and material lead times visible.

Complete project · One sequence

When the scope and access allow it, coordinate the rooms as one project with clear readiness checks and completed-stage reviews.

See scope, stage and change-record examples →

Before the start date

Vacant home or living through the work?

Planning decisionWhat we agree before scheduling
Daily accessWhich rooms, entrances and bathrooms must remain usable; how work areas are separated.
Protection & cleanupThe occupied spaces, furniture, material storage and debris routes included in the plan.
Product readinessWho orders, checks and receives cabinets, flooring, doors, fixtures and other selected products.
Communication & changesWho confirms decisions, how added work is priced and which stages are reviewed before the next payment.
Plan work before moving in →

Your next step

Tell Kirill about your home.

Share the rooms you want to change, your city or ZIP code and any timing that matters. Photos and an approximate budget help us start a useful conversation.

  • Review your priorities and existing conditions.
  • Discuss whether a walkthrough is the next step.
  • Define the scope before agreeing the work.
Request my project review

Opens our existing project request form.