You bought a home that needs work.
Combine surface repairs, painting, flooring, doors and selected bathroom updates before furniture moves in. Discuss your closing date, access and move-in priorities first.
Austin-area home remodeling
Renovating before you move in? Updating several rooms? Kir Remodeling brings the work together with one owner and project manager, a clear written scope and a coordinated team.
Personally managed by Kirill Ostrovskii
Austin · Round Rock · Cedar Park & nearby communities

Start with what you want to change
A room-by-room wish list becomes easier to manage when the work is planned as one project. Start with your situation, even if you have not chosen every finish.
Combine surface repairs, painting, flooring, doors and selected bathroom updates before furniture moves in. Discuss your closing date, access and move-in priorities first.
Bring several rooms or a first-floor refresh into one defined scope. Plan the sequence of drywall, floors, doors, trim and painting with one point of contact.
A bathroom, uneven flooring, outdated doors or worn outdoor space can be a useful starting point. Share the conditions and we will review the right scope.
Services that work together
Choose a coordinated interior remodel or a clearly defined improvement. Each proposal explains the included work, material responsibilities and sequence before the project begins.
Room changes, apartment renovations and connected updates across several spaces. One project plan brings the team, access, preparation and finish work together.
Update a tired bathroom with a defined plan for demolition, preparation, waterproofing, tile and finish details. Review layout and fixture choices before work starts.
Replace popcorn texture or repair damaged surfaces before painting. The finish level and preparation are specified for the room, lighting and existing conditions.
Install LVP or engineered wood with attention to the surface underneath. Review flatness, transitions, doors and baseboards as part of the flooring scope.
Fresh paint starts with preparation. Define which walls, ceilings, doors, trim or exterior surfaces are included, along with repairs, primer and finish coats.
Bring the final details together with fitted doors, clean casings and consistent trim. Existing openings, hardware and finish choices determine the work.
Coordinate selected window replacements with repairs to the surrounding interior. Confirm product dimensions, exterior conditions, access and any approvals before ordering.
Repair or rebuild an outdoor space with the scope based on its existing condition. Discuss framing, decking, railing, steps and concealed damage before choosing a plan.
One point of contact across the agreed scope. Kirill coordinates the project and team. Licensed plumbing, electrical and HVAC specialists can be involved when required. Their work, approvals and responsibilities are clarified in your proposal.
Proof in completed work
Real Austin-area projects, with photos and scope details. Published budgets describe those specific jobs and help start a conversation about your own.

Smooth ceilings and Level 5 walls, a complete bathroom, interior doors, three windows and closet storage.
$19,500 completed labor scope. Materials separate.
Explore the project
Bathroom, kitchen, flooring, drywall, paint, doors and trim coordinated across one condo.
$16,500 original labor agreement. Materials and later extras separate.
Explore the project
Large-format tile, an acrylic tub, a glass panel, vanity and updated bathroom fixtures.
$9,500 completed labor scope. Materials separate.
Explore the projectYour project will be priced for its size, existing conditions, selections and exact scope. These completed-project figures are examples, rather than starting prices or quotes for a new home.
Browse All Completed WorkA clear next step at every stage
A renovation needs a practical plan for your home, your decisions and the people doing the work.
Share the rooms, location, priorities and timing. Kirill reviews the initial request and discusses whether a walkthrough is the right next step.
Review included work, exclusions, material responsibilities, stages and schedule. If useful, separate essential work from a later phase.
Kirill coordinates the team and sequence. Discuss selections and document scope changes before adding work. Stage payments follow the agreed plan.
Review the finished scope together, identify remaining details and confirm the next steps for any punch-list items and workmanship support.
Planning a larger renovation? Start with the whole wish list. We can review a complete project or separate it into practical phases. Share your approximate budget if you have one; a written proposal follows review of the actual conditions and scope.

Kirill Ostrovskii / Owner & Project Manager
Kirill is your point of contact for defining the scope, coordinating the team, discussing changes and reviewing the result. You can talk directly to the person organizing your renovation.
What homeowners say
Homeowner comments about room remodeling and flooring projects.
HOME REMODELING“Bedroom remodel was done quickly and efficiently. Kirill and Roman were flexible when we wanted to add to the scope of the project.”
FLOOR INSTALLATION OR REPLACEMENT“Kir did vinyl flooring in a room that was incredibly bumpy. They took the time to level it all and even fixed some flooring I did myself.”
Local homes. Personally managed.
We review home remodeling projects in Austin, Round Rock, Cedar Park, Georgetown, Leander, Lakeway and Pflugerville. Share your city or ZIP code so we can confirm project fit and scheduling.
From an apartment renovation in Austin to interior painting in Round Rock or flooring in Cedar Park, the best starting point is a project close to your own.
Explore projects by location and scopeBefore you plan the work
Yes. Flooring, drywall, painting, doors, trim and bathroom work can be reviewed as one connected renovation. Kirill helps define the sequence, included work and responsibilities before the project begins.
Yes. Share your closing date, access arrangements, move-in target and priority rooms. Work that creates dust or requires open access can be planned before furniture moves in. The schedule depends on the agreed scope, selections and product availability.
Pricing depends on the rooms, existing conditions, preparation, layout, materials and work included. The completed apartment on this site had a $19,500 labor scope with materials separate. That is one project example. Your written proposal is based on your own home and scope.
Our labor-only proposals separate labor from materials. Homeowners purchase materials directly or reimburse the exact receipt cost without a contractor markup, as agreed. Selection, ordering and delivery responsibilities are defined in the proposal. Payments are tied to agreed completed stages.
Licensed specialists can be coordinated when plumbing, electrical or HVAC work is required. Approval and permit responsibilities depend on the proposed work and property. These are reviewed before scheduling the affected work.
That depends on the rooms affected, safe access, dust, noise and availability of essential facilities. Discuss occupied rooms and daily routines at the start. Some projects can be phased; others are more practical before move-in or during a temporary move-out.
Yes. Send the location and a description of the work. A bathroom, flooring installation, door replacement or other focused improvement can be reviewed as its own scope. We will discuss whether the project fits the team and schedule.
Kirill reviews your description and contact details, then follows up to discuss your priorities and next step. An initial project review is free. It is a conversation about scope and fit; a detailed quote follows review of the work and existing conditions.
Free initial project review
A few details are enough to start. Share the spaces you want to change, what matters most and any move-in deadline. Kirill will review the request and discuss the next step with you.