Removal and preparation
Review the existing covering, flatness, damaged areas, and height changes. The proposal identifies removal, disposal, and the preparation included.
Plan flooring, substrate preparation, and room transitions together. Before pricing the job, we review the existing floor, door clearances, and how the affected rooms connect.
Review the existing covering, flatness, damaged areas, and height changes. The proposal identifies removal, disposal, and the preparation included.
Confirm the selected product, plank direction, transitions, and thresholds where adjoining floors meet.
Decide whether existing baseboards can stay and whether shoe molding, new trim, or door-clearance adjustments belong in the same scope.
Explore Door InstallationThe Cedar Park project started with an uneven plywood subfloor that needed preparation and leveling before the NuCore planks went in.

Two flooring estimates can cover different work under the planks. Check whether furniture moving, demolition, leveling, thresholds, trim, and door adjustments are included. Concealed damage may need a separate review once the old covering comes up.
Yes. We review layout, doorways, height differences, product requirements, and room access together.
The proposal identifies preparation. The condition and product requirements determine the work needed.
Initial project review
Tell Kirill what you’d like to change or build. He’ll follow up to discuss your project and whether a walkthrough makes sense.